Beyçelik Gestamp Renewables

Beyçelik Gestamp Renewables, was founded in August 2009 in order to operate in the fields of electricity generation and trade.  Beyçelik Gestamp Renewables is joint organisation of Spanish Gestamp Wind and Beyçelik Holding. 

Beyçelik Gestamp Renewables, that adopted an environmentalist policy turned towards wind power, one of the most important and efficient resources of the country, in order to invest in renewable resources. Goal of the company is to gain natural energy resources of the country to economy of the country as soon as possible, in most efficient manner and by using cutting edge technologies.

Beyçelik Gestamp Renewables' subsidiaries;

Turguttepe RES (Wind Power Plant) for which Generation License was obtained by SABAŞ ELEKTRİK ÜRETİM A.Ş. on 08.06.2007 is situated within borders of Milas District, Muğla and Çine District, Aydın. First ETKB (Ministry of Energy and Natural Resources) acceptance of Turguttepe RES that started to be constructed in 2009 was made within 2010 and entire plant was commissioned in 2011. Turguttepe RES has 24 MW installed power with 12 pcs of Vestas V90 2 MW turbines. Turguttepe installed power rose to 39 MW in 2016 upon capacity increase. Authorization works for turbines to be installed are continuing.

Yahyalı RES for which Generation License was obtained by BAK ENERJİ ÜRETİMİ A.Ş. on 07.09.2011 is situated within borders of Yahyalı District, Kayseri. First ETKB (Ministry of Energy and Natural Resources) acceptance of Yahyalı RES that started to be constructed in 2016 was made within 2016 and entire plant was commissioned in 2017. Yahyalı RES has 82,5 MW installed power with 25 pcs of Vestas V126 3.3 MW turbines. Yahyalı RES installed power rose to 92,85 MW in 2019 upon capacity increase. Authorization works for turbines to be installed are continuing.

Adares RES for which Generation License was obtained by YGT Elektrik Üretim A.Ş. on 12.05.2011 is situated within borders of Selçuk District, Izmir and Kuşadası District, Aydın. ETKB (Ministry of Energy and Natural Resources) acceptance of Adares RES that started to be constructed during later part of 2014 was made within 2015 and entire plant was commissioned in. Adares has 10 MW installed power with 5 pcs of Gamesa G97 2 MW turbines. Adares RES installed power rose to 22 MW in 2016 upon capacity increase. Capacity increase will be commissioned at February 2021 with 3 pcs of Enercon E-126 4 MW turbines.

Beyçelik Gestamp Renewables
Ahmet Yesevi Mahallesi Bahçe Sokak No:5/8 Nilüfer Bursa, Turkey
  • T: +90 224 270 06 00
  • F: +90 224 241 52 00

TURGUTTEPE WPP
Milas Muğla, Turkey
  • T: +90 252 513 00 84
  • F: +90 252 513 04 50

YAHYALI WPP
Yahyalı Kayseri, Turkey
  • T: +90 352 619 12 01
  • F: +90 352 619 12 00

ADARES WPP
Selçuk İzmir, Turkey
  • T: +90 232 894 10 21
  • F: +90 232 894 10 22
Diğer Energy Yatırımlarımız