subject close

Bewen Energy

Bewen Enerji A.Ş., founded as a result of the partnership between Beyçelik Holding A.Ş. and Elawan Energy S.R.L operates in the production and trade of electricity using renewable energy resources including, in particular, wind and solar energy. Bewen Enerji A.Ş. affiliates are BAK Enerji Üretimi A.Ş., SABAŞ Elektrik Üretim A.Ş. and YGT Elektrik Üretim A.Ş.

Bewen Energy aims to bring natural energy sources to the country’s economy as swiftly and efficiently as possible using the very latest technology.

Located within the borders of Milas, Muğla and Çine, Aydın, Turguttepe WPP attained a production license on 08.06.2007 thanks to SABAŞ ELEKTRİK ÜRETİM A.Ş. The first acceptance by the Ministry of Energy and Natural Resources for Turguttepe WPP whose construction started in 2009 was made in 2010 and the entire plant was put into use in 2011. Turguttepe WPP has an installed capacity of 24 MW with 12 turbines of Vestas V90 2 MW. Turguttepe’s license power increased to 37.8 MW upon a capacity enhancement in 2016. Plus, the plant was given permission for an additional capacity increase of 6.8 MW in 2022. Procedures to incorporate the capacity of 6.8 MW into the license and the permit work for newly established turbines are on track.

Located within the borders of Yahyalı, Kayseri, Yahyalı WPP attained a production license on 07.09.2011 thanks to BAK ENERJİ ÜRETİMİ A.Ş. The first acceptance by the Ministry of Energy and Natural Resources for Yahyalı WPP whose construction started in 2016 was made in 2016 and the plant’s 82.5 MW-section was put into use in 2017. Of the 10.35 MW-capacity increase permitted in 2019, the 9 MW was put into use in 2023 upon its acceptance by the Ministry of Energy and Natural Resources. Yahyalı WPP has an installed capacity of 91.5 MW with 25 Vestas V126 3.3 MW-turbines and two Vestas V150 4.5 MW-turbines. Plus, the plant was given permission to increase its capacity further to 20.4 MW in 2022. Procedures to incorporate the capacity of 20.4 MW into the license are on track.In addition to wind energy capacity increases, a 71.4 MW auxiliary solar power plant was approved for hybrid operation in 2021. Work on SPP establishment continues, with the complete capacity expected to be operational by 2024

Located within the borders of Selçuk, İzmir and Kuşadası, Aydın, Adares WPP attained a production license on 12.05.2011 thanks to YGT Elektrik Üretim A.Ş. The first acceptance by the Ministry of Energy and Natural Resources for Adares WPP whose construction began in late 2014 was initiated in 2015 and the plant’s 10 MW-section was put into use the same year. The installed power of Adares WPP increased to 22 MW with a capacity increase in 2016. The capacity increase was put into use in February 2021 with three Enercon E-126 4 MW-turbines.

Adares WPP has an installed power of 22 MW with five Gamesa G97 2 MW-turbines and three Enercon E-126 4 MW-turbines. An additional capacity increase of 11 MW was performed in 2022 upon the permission to increase the capacity. Works continue to put capacity increases into use

Bewen Energy
Ahmet Yesevi Mahallesi Bahçe Sokak No:5/8 Nilüfer Bursa, Turkey
  • T: +90 224 411 03 04
  • F: +90 224 411 03 05

TURGUTTEPE WPP
Milas Muğla, Turkey
  • T: +90 252 513 00 84
  • F: +90 252 513 04 50

YAHYALI WPP
Yahyalı Kayseri, Turkey
  • T: +90 352 619 12 01
  • F: +90 352 619 12 00

ADARES WPP
Selçuk İzmir, Turkey
  • T: +90 232 894 10 21
  • F: +90 232 894 10 22
Diğer Energy Yatırımlarımız